Industrial Expansion in Beni Suef
Prime Minister Mostafa Madbouly visited the Beni Suef governorate on Saturday to inspect new manufacturing facilities and infrastructure developments. The tour began at the Compra factory, an air-conditioner compressor plant developed by the El Araby Group in partnership with Taiwan’s Rechi.
Abdelrahman Salah El Araby, managing director of Compra, stated that the facility operates in two phases. The first phase spans 15,000 square meters, employs 300 workers, and produces 1.5 million compressors annually. The second phase aims to expand the site to 25,000 square meters, increasing production capacity to 4.5 million units and creating 500 jobs. According to company officials, the plant utilizes energy-saving inverter technology and environmentally friendly refrigerant gases.
Feng Ming-fa, president and managing director of Rechi, said the collaboration introduces new assembly technology to Egypt. He stated that the company plans to begin exporting compressors from the site within three years. Mohamed El Araby, CEO of the El Araby Group, noted that the project is part of a broader strategy to manufacture components locally rather than relying solely on finished goods. Industry Minister Khaled Hashem added that the facility is expected to reduce national reliance on imported appliance components.
Textiles and Transportation Infrastructure
Madbouly also visited the Lee Hwa Egypt textile factory, located in the Kom Abu Radi industrial zone. The South Korean-owned plant, which began operations in 2020, represents a $150 million investment. The facility employs approximately 455 people and produces raw, dyed, and finished polyester fabrics, with some output exported to the United Arab Emirates.
The Prime Minister concluded his tour at the Fayoum/Beni Suef station, part of the national high-speed electric rail network. Accompanied by Transport Minister Kamel Al-Wazir, Madbouly reviewed progress on the project. The station, located at Demo, serves both governorates and sits on the network’s second line. This line spans 1,148 kilometers from 6th of October City toward Upper Egypt, with trains designed to reach speeds of 250 km/h.